Complete general rooms and a finish-specific floor route without transferring contaminated tools or repeating floor time.
Open the full-size diagram ↗
Example and worksheet
Connect this lesson to the complete Case H records. Keep the fictional example separate from your own project.
Complete general-room tasks before the floor finish
Use the green general-room tools on the accessible, assessed bedroom and living-area surfaces. Work through one zone deliberately, from higher included surfaces toward lower ones, then move to the next. Keep contact light and controlled. Electronics, artwork, books, finished furniture, and painted trim may require separate instructions or exclusion; a general-room cloth is not permission to wipe everything. Ask the household to clear private possessions rather than moving or sorting them without agreement.
In Case H, the three bedrooms share forty-five first-visit nonfloor minutes; living and dining receive twenty-five, and hall and entry ten. Bed making is included only when the quote actually says so, and laundering or organization remains excluded. Record a blocked bedside table as blocked instead of dusting around it and marking the whole room complete. These room phases prepare the home for the final floor route; they do not each contain another unrecorded full floor-cleaning allowance.
Map finish changes before bringing out a damp pad
Trace the floor route across all eight zones. Mark the finish, approved dry method, approved damp method if any, transitions, and the direction back toward a safe exit. A single open-plan area can contain two floor materials, while several rooms may share one. Keep those boundaries clear on H08 and H18. Do not infer finish from a wood-grain pattern: it might be wood, laminate, or luxury vinyl.
The known wood example uses the professional hardwood product only on its identified finish. Case H uses known hardwood in the bedrooms, living/dining area, and hall; assessed glazed ceramic tile and grout in the bathrooms and kitchen follow their own compatible care and rinse requirements. The separate Bona LVT selection is on HOLD: its 2026 technical sheet describes a clear product at pH 6.0–6.5, while the linked 2022 SDS for product (750) describes blue liquid at pH 7–8.5. A shared webpage is not proof of the same formulation. H18-E lists the evidence needed before selecting that product. No LVT chemical procedure is approved here.
Open the full-size illustration ↗
Illustration sources: HT05.
Remove dry grit with the right contact tool
Inspect the vacuum's floor head, wheels, and contact edges for grit or damage before touching an assessed finish. Choose the attachment and setting permitted by both the machine and the floor instructions. Use controlled passes with small overlaps so coverage can be traced, without grinding repeatedly at a mark. Protect furniture legs and door edges with clearance, not by dragging the machine around them. Keep the cord out of the route and never pull the plug by its cord.
A dry indoor vacuum is not a spill-recovery machine. The commercial manual example in H09 excludes wet surfaces and chemical pickup. Stop if you encounter liquid, sharp debris, hazardous material, or an equipment fault; use the relevant assessed response instead. Do not claim ordinary vacuuming establishes microbial removal or remediation. Clean and reset attachments under their maker's instructions between appropriate zones and residences. A bathroom-contact attachment is not carried to kitchen work without the required separation and reset.
Open the full-size illustration ↗
Illustration sources: HT07, HT12, HT18, HT20.
Open the full-size illustration ↗
Illustration sources: HT07, HT12, HT18.
Use controlled finish-specific damp cleaning
After dry soil removal, use a clean dedicated pad for the selected floor method. Work a manageable section that leaves you on the dry side with an exit available. On the identified polyurethane wood, follow the matched hardwood instructions with limited moisture. A vinyl pattern does not authorize the held LVT product; use no chemical there until its separate evidence is resolved. Change or appropriately clean a loaded pad rather than spreading gray residue. Do not pour extra cleaner onto a difficult spot or wet-mop wood.
For an identified tile installation, complete its prescribed clean-water rinse and excess-moisture removal using the compatible selected method. Control water around grout, transitions, baseboards, and neighboring wood. Keep bathroom, kitchen, and general-room floor tools separated. Do not use steam as a universal shortcut. An area is not ready merely because a product sheet gives a typical drying time; inspect the real surface and restrict access while moisture or residue remains. If the route cannot stay controlled, pause and agree a safer sequence.
Reconcile coverage and reopen the route
Check the route against the eight-zone map, including reachable corners and transition edges. Look for missed loose soil, streaks, residue, and wet patches under suitable lighting. Compare with existing-condition notes instead of trying to polish out wear. Mark held or inaccessible sections precisely. A dry-looking surface does not prove every finish is unharmed; record the limits of the inspection and stop if a new change is suspected.
The first Case H floor phase is forty minutes across those eight zones; the repeat is thirty. These are modeled allowances for the assessed package. If a household interruption requires a second floor pass, record that extra time once as actual work. Do not relabel floors as a ninth room or hide the repeat pass in every room's time. Reopen areas only when their specific readiness conditions are met and tools, cords, and warning equipment can be removed without creating another obstruction.
For the held LVT candidate, obtain manufacturer confirmation tying the purchased SKU, country, formula or batch, current label, and current SDS together, plus an explanation of the document differences. Keep the original files. Do not decide which color or pH is correct by a home test, guess, or marketing claim.
Put it into practice
Your assignment
Build a floor route and correct a double-counted time sheet.
Inputs
- Base Case H has eight zones: identified polyurethane hardwood in bedrooms/living/hall and assessed glazed ceramic tile/grout in bathrooms/kitchen; floor work is counted once.
- A draft includes 40 floor minutes plus 10 floor minutes inside each of 8 room rows.
- A bathroom pad is used; a sealed clean kitchen pad is available.
- Separate selection variant: Bona LVT SKU WM700018192 has an unresolved technical-sheet/SDS formulation match; it is not part of the base Case H floor method.
Your deliverable
H08/H17/H19 route with finish changes, tool transitions, and corrected time.
Saved only in this browser when storage is available. Export this page separately and use fictional identifiers in practice.
Show the worked answer
- Keep the planned floor phase 40 once. Remove the 80 duplicated minutes from room allowances; do not call the result a ninth room.
- Use the separately verified wood and tile methods; keep the unresolved LVT product on HOLD; mark unidentified finishes HOLD.
- Contain the bathroom pad and select the clean kitchen pad. Do not transfer a used bathroom pad or solution into the kitchen.
Show the self-check criteria
- Dry grit removal precedes supported damp treatment.
- The route maintains dry access and separate tools.
- Floor coverage and timing reconcile to the same eight zones.
- The LVT candidate remains HOLD until its purchased formulation, label, and SDS correspondence is confirmed; no active LVT recipe is copied from the mismatched pair.
Sources: HT05, HT07, HT12, HT14, HT15, HT16, HT18, HT20, HT21, HT22.