SBA — Plan your business
SB01 · Checked 2026-11-18
Research demand and comparable offers, plan startup resources and test a bounded service hypothesis.
General planning framework, not evidence of local screen demand, earnings or supplier prices.
SBA — Launch your business
SB02 · Checked 2026-11-18
Structure, business registration, applicable licenses, banking and insurance require decisions matched to actual activities and location.
No universal entity choice, licensing fee, approval time or coverage promise.
IRS — What kind of records should I keep
SB03 · Checked 2026-11-18
Maintain a system showing business income/expenses with supporting transaction documents; management examples do not replace actual evidence.
Does not determine every retention period, deduction, accounting method or tax liability.
IRS — Independent contractor self-employed or employee
SB04 · Checked 2026-11-18
Classify the actual worker relationship, considering behavioral/financial control and the relationship; labels alone are insufficient.
Federal tax framework does not resolve separate state wage, unemployment, workers compensation or licensing tests.
Washington WAC 458-20-173 — Installing cleaning repairing or improving personal property of consumers
SB05 · Checked 2026-11-18
Consumer tangible-property repair/install services are retailing B&O activity; retail sales tax applies to the total service/material charge subject to applicable law. Repair parts for qualifying resale are distinguished from consumed business supplies.
No screen-specific individual ruling, current rate, exemption, sourcing determination or universal resale-purchase approval. Do not transfer janitorial-service treatment to this topic.
Washington WAC 458-20-136 — Manufacturing processing for hire fabricating
SB06 · Checked 2026-11-18
Sections 2,4,6 distinguish production of new custom articles from repair/reconditioning and explain manufacturing/selling reporting and multiple activities tax credits when applicable.
A screen-business determination depends on actual activities and facts. This rule is not an automatic mobile-business manufacturing exemption or a finding that every onsite task is manufacturing.
Washington WAC 458-20-170 — Constructing and repairing buildings or structures upon real property
SB07 · Checked 2026-11-18
Building-construction and installation definitions include installing or attaching tangible items to real property; actual fitting/attachment facts require separate assessment.
Does not decide whether every removable-screen placement is construction, provide a permit decision or settle an individual manufacturing issue.
Washington DOR — Determine the location of my sale
SB08 · Checked 2026-11-18
Sourcing depends on receipt of goods/services and installation facts; repaired merchandise picked up at a repair facility is distinguished from other delivery/service arrangements.
No verified city rate supplied. Case S 10% is fictional arithmetic only.
Washington DOR — Apply for a business license
SB09 · Checked 2026-11-18
Use the Business License Application and relevant state/city endorsements; some entity filings precede that application and activity-specific agencies may be separate.
No universal fee, one-week timeline or claim that the application alone authorizes the complete mixed screen offer.
Washington L&I — Register as a Contractor
SB10 · Checked 2026-11-18
Actual construction contracting requires applicable registration, bond and liability coverage; general and specialty arrangements differ. Resolve actual screen removal/fitting/attachment scope with L&I.
Current published amounts/times are intentionally not taught as universal startup costs. General business registration and a submitted application are not proof of activity authorization.
Washington L&I — Independent Contractors
SB11 · Checked 2026-11-18
Workers compensation exemption depends on applicable tests; a UBI or contractor number alone is insufficient. Assess actual arrangement before hiring.
Not a worker-specific determination, wage quote or complete employer-cost calculation.
FTC — Protecting Personal Information A Guide for Business
SB12 · Checked 2026-11-18
Inventory data, minimize collection, protect retained information, dispose appropriately and plan responses; applied to household access, private images, tags and records.
Not a universal privacy policy, retention deadline, breach-law determination or permission to publish household photos.
FTC — Soliciting and Paying for Online Reviews A Guide for Marketers
SB13 · Checked 2026-11-18
Genuine experience, platform rules and neutral solicitation; do not request only likely-positive customers. Course company policy uses no incentives and no review gating.
Not a claim every incentive is universally unlawful or every platform permits review requests. Customer contact preferences and real service experience still apply.
FTC — Cooling-off Period for Sales Made at Home or Other Locations
SB14 · Checked 2026-11-18
Some covered consumer sales involve mandatory cancellation disclosures and rights; check actual sales channel, facts and exceptions before beginning work or using cancellation terms.
No claim all screen visits or all online sales have identical cancellation rules; a same-visit preference is not a waiver of mandatory rights.
Google Business Profile — Manage service areas
SB15 · Checked 2026-11-18
Represent actual service-area business arrangements; do not display a customer-serving storefront address if customers are not served there.
A listing setting does not establish local authorization, travel profitability, demand or permission to create duplicate profiles.
IRS — Self-employed individuals tax center
SB16 · Checked 2026-11-18
Self-employed owners must identify applicable income/self-employment and estimated-payment duties according to their circumstances.
Not a personal tax calculation, universal reserve percentage or statement that the management result is taxable income or take-home pay.
Washington DOR — Retail sales tax
SB17 · Checked 2026-11-18
Retail consumer sales/services and own-use purchases are distinguished from qualifying resale purchases documented with a reseller permit.
Not blanket tax-free purchasing for tools/fuel/supplies or an exemption for every component transaction. Actual use and documentation matter.
Washington DOR — Combined excise return State B&O tax instructions
SB18 · Checked 2026-11-18
Reporting begins with gross income under appropriate B&O classifications, with applicable deductions/credits handled separately from ordinary business expense deductions.
No current B&O rate, individual classification, MATC computation or assurance that a fictional planning allowance pays actual business taxes.
SBA — Manage your business
SB19 · Checked 2026-11-18
Review finances, employees and operations against actual resources and business commitments.
General operational guidance, not included business coaching, a payroll quote or an accounting opinion.
Washington WAC 296-200A-016 — Specialty contractor classification definitions
SB20 · Checked 2026-11-18
Official contractor-registration specialty descriptions include exterior screens and certain permanent window coverings, supporting a fact-specific installation inquiry to L&I.
Classification definitions are for contractor registration only; they do not themselves assign a learner to a specialty or establish all tax, building-permit or worker classifications.
Washington RCW 82.04.050 — Sale at retail retail sale
SB21 · Checked 2026-11-18
Retail-sale definitions include consumer sales of fabricated tangible articles, consumer repair/install services and installing or attaching articles to buildings. Supports fact-specific classification inquiry for the mixed screen offer.
Statute includes amendments and effective provisions; no individual ruling, verified rate, exemption or determination that every removable-screen task is construction. Apply current provisions to actual facts with DOR guidance.
FTC — Buyer’s Remorse: The FTC’s Cooling-Off Rule May Help
SB22 · Checked 2026-11-18
Explains the federal three-business-day right for certain consumer sales, the entirely online exception, invited-home presentations, requested personal-property repair limits, disclosures and cancellation procedures. Supports a narrowly described fictional email-only contract channel.
An emailed acceptance alone does not establish an entirely online sale after prior personal selling. Actual facts, covered additions, current state/local protections and any applicable notices or timing need separate review.
16 CFR Part 429 — Cooling-off Period for Sales Made at Homes or Certain Other Locations
SB23 · Checked 2026-11-18
Sections 429.0–429.2 define covered solicitation, invited-home contact, limited requested-repair exclusion, business-day counting, completed contract/receipt and duplicate cancellation notice, oral disclosure and preservation of stronger state/local protections.
No individual classification or ready-to-sign local contract is supplied. Do not infer a universal exemption for mobile work, custom screens, electronic signatures or requests for an immediate start; use current rule text and actual facts.
Washington Attorney General — Cancellation Rights
SB24 · Checked 2026-11-18
Official Washington consumer guidance distinguishes federal door-to-door protections and category-specific rules, including certain retail installment and commercial telephone solicitation transactions. Supports checking the actual contract channel and local obligations.
Not a ruling that all Washington screen transactions have the same cancellation period, or that every online transaction lacks state or local protections. This course does not supply financing or a universal cancellation notice.
Washington WAC 458-20-173 Consumer Personal Property Repair
SF01 · Checked 2026-11-18
Primary Washington rule supports researching retailing and retail sales tax for consumer personal-property repair, including service charges and recovered expenses.
Does not establish a local rate, approve a particular business classification for every task, cancel other business taxes, or determine manufacturing treatment. Case S uses a fictional 10% arithmetic rate.
Washington RCW 82.04.050 Sale at Retail
SF02 · Checked 2026-11-18
Primary retail-sale definition includes tangible goods, including fabricated articles, and relevant consumer services. Supports checking the actual repair/fabrication transaction rather than reusing an unrelated exemption.
The full current statute and actual facts control. Does not establish a city rate, reseller-permit eligibility, manufacturing consequences or complete tax advice.
IRS What Kind of Records Should I Keep
SF03 · Checked 2026-11-18
Official guidance supports organized transaction summaries and supporting purchase, receipt, payment and other business documents.
The course planner is a management exercise, not a tax return, inventory-method election, depreciation schedule, deduction opinion or complete records-retention policy.
SBA Calculate Your Startup Costs
SF04 · Checked 2026-11-18
Official startup-planning guidance supports identifying one-time and ongoing costs and estimating the funding needed before launch.
Every Case S price, time, material cost, equipment allowance, workload and startup amount is original fiction, not an SBA estimate, supplier quote or market evidence.
ADFORS — Screen Frame Kit Instructions
ST01 · Checked 2026-11-18
Selected-kit corner deduction, optional-spring distinction, square-cut hand-hacksaw assembly, matching corner sequence, new-kit mesh preparation, pull-tab position, concave splining and outside-edge trimming. Case calculations and original diagrams apply these facts to the explicitly selected no-spring 30 x 40 target.
One-page manufacturer instruction for this kit only. Do not transfer its deduction, optional-spring adjustment or mesh margin to other frame systems or infer a universal opening clearance. No present-day fit/approval for a particular real window is established by the guide.
ADFORS — Screen Frame Kits product page
ST02 · Checked 2026-11-18
Official current page identifies the 48 x 48-inch 5/16-inch white kit in product image descriptions and links its manufacturer instructions; mesh is obtained separately.
Product page is not a window-specific fit record or current local supplier availability/price guarantee. Current physical package and component instructions must be checked.
ADFORS — Screen Accessories brochure, 1716 1/16
ST03 · Checked 2026-11-18
Official legacy parts identification: white 48 x 48 kit FSP8495-U, UPC 011646715890; same-brand accessories and spline product identifiers. Helps distinguish a complete kit from separate unverified components.
Catalog itself is older, despite its 2021 hosted path. Historical IDs are not a guarantee of current SKU/formulation, package length or stock. Course does not invent a per-kit supplied spline length or use list packaging dimensions as frame-rail dimensions.
ADFORS — How To Replace Screen Instructions
ST04 · Checked 2026-11-18
Separate rescreen route: flat support, at least 2-inch overlap beyond each spline groove, fiberglass concave-roller process and controlled outside-edge trim. Lists .140-inch spline recommendation for Standard Fiberglass.
Recommendation must be combined with the actual identified frame/channel evidence; it is not a universal spline rule. Aluminum pre-creasing is not transferred to fiberglass. Separate kit instructions use a different stated margin; the course keeps the routes separate.
ADFORS — Fiberglass window and door insect screen
ST05 · Checked 2026-11-18
Identifies the selected standard fiberglass product family and available roll formats, with official resource links. The course uses named standard fiberglass rather than assuming a specialty mesh is interchangeable.
No unsupported airflow, energy, disease-prevention, containment, security or service-life claim. Material characteristics are not an installed assembly approval.
ADFORS — Screening and Accessories retail brochure, 1721 6/19
ST06 · Checked 2026-11-18
Official brochure identifies frame-kit contents: four aluminum pieces, four corners, two pull tabs, spline and two optional tension springs; lists standard screening and multiple spline sizes/lengths. Supports whole-kit component accounting and the need to identify stock.
Older brochure is not a current price list or assurance that any groove accepts a listed spline. Optional unused springs are not charged as separate consumed purchase value after the whole kit has been allocated.
Milgard — How to Measure Window and Patio Door Screens
ST07 · Checked 2026-11-18
Manufacturer measuring example distinguishes width/height, outside corner references, hardware locations and product-dependent conventions. Supports recording the actual system rather than glass dimensions or a bowed midpoint.
Milgard-specific 2017 guide. Do not universalize its numerical precision, lip/body exception, hardware or removal sequence. Case S kit compatibility is not attributed to Milgard.
Phifer — How to Choose the Right Screen Spline Size
ST08 · Checked 2026-11-18
Spline selection depends on the actual channel and screening. Named heavier materials and profiles can require different combinations. Supports HOLD for an unidentified groove or substituted mesh.
Phifer generic prose, charts and FAQs simplify material cases differently. Course does not resolve ambiguity by force, use a universal groove-diameter equality or transfer a Phifer brand-specific exception to ADFORS.
Andersen — Window and Door Safety
ST09 · Checked 2026-11-18
Insect screens are not fall prevention; preserve window operation and intended escape function. Repair access must not use furniture or pressure against glazing. Supports explicit limits and no person/pet pressure demonstration.
Manufacturer public safety information is not a national egress-code assessment, ladder tutorial, screen load rating or pet-containment certification. Starter course excludes elevated access and window/building alteration.
U.S. Fire Administration — Fire Escape Plan Pictographs
ST10 · Checked 2026-11-18
Public fire-escape education includes opening windows and removing screens. Supports preserving the designed removable function rather than permanently fastening an insect panel as a fit repair.
Not a product installation manual or jurisdiction-specific technical code determination. No child escape demonstration, unsafe access or building compliance certification is taught.
Viwinco — QAP016-B Screen Quality Standards, effective 2025-04-10
ST11 · Checked 2026-11-18
Manufacturer inspection categories include corners, central mesh, operating hardware, labels, seated spline, frame shape and visible defects. Course creates an original nonnumeric staged inspection matrix using these categories.
Viwinco numerical cut/bow/miter/scratch tolerances are not transplanted to ADFORS or presented as industry-wide standards. Matrix observations are not pressure/load testing, hidden-defect assurance or long-term performance certification.
Andersen — Proper Removal and Storage of Andersen Insect Screens, article 000006777
ST12 · Checked 2026-11-18
Removal follows the particular installation guide. Storage supports the frame to prevent bowing/bending and protects it from damaging pressure. Supports protected screen staging and transport preparation.
Andersen example is not the removal sequence for all systems, including Case S, and not a vehicle cargo-securement specification. Course requires the actual opening method and transport instructions.
U.S. EPA — Renovation, Repair and Painting Program: Contractors
ST13 · Checked 2026-11-18
Paid work disturbing paint in covered pre 1978 housing/child-occupied facilities can trigger training, certification and work-practice requirements; ordinary repair can create lead dust. Supports stopping suspect coating disturbance outside the starter offer.
Do not imply all detachable-screen bench repair is covered, every older paint contains lead or every small disturbance is exempt. State/Tribal programs and rule exceptions matter; no abatement or exemption shortcut is taught.
Canadian Centre for Occupational Health and Safety — General Hand Tool Operation
ST14 · Checked 2026-11-18
Choose appropriate tools, inspect their condition, support stock on a bench/vice, keep sharp edges covered and do not cut toward the body or misuse a screwdriver as a pry tool. Supports the original setup and controlled-trim workflow.
Primary Canadian safety guidance used for practical precautions, not represented as U.S. law or complete training. The actual tool instructions and task hazard assessment remain necessary; no universal glove specification is invented.
Canadian Centre for Occupational Health and Safety — Hand Saw
ST15 · Checked 2026-11-18
Hacksaw guidance supports a suitable blade, rigid secure blade setup, controlled strokes, support/clamping and stopping for a loose or twisting blade.
Not a detailed manual for a particular purchased saw or authority for powered cutting. Course does not prescribe universal tooth count, lubricant or tool adjustments and does not repeat potentially confusing generic wood-saw starting advice as aluminum-rail technique.
OSHA — Hand and Power Tools overview
ST16 · Checked 2026-11-18
Tools can cause severe injury if used or maintained improperly; hazard recognition, appropriate controls and tool-specific preparation matter. Supports a documented hand-tool readiness check.
Overview is not a finding that one legal standard applies to every sole proprietor or task. It does not certify the selected table or teach unverified powered equipment use.
OSHA — Medical Services and First Aid, 29 CFR1910.151
ST17 · Checked 2026-11-18
Appropriate availability of medical advice, trained first aid where applicable, and first-aid supplies inform the original incident card and advance contact preparation.
Applicability depends on actual employment/work classification and jurisdiction. This source is not a medical-treatment protocol. No course-specific eye flushing, wound treatment or fragment removal is prescribed; serious emergencies use 911 and trained/medical directions.
ADFORS — STANDARD Screen Sell Sheet, 2024 hosted edition
ST18 · Checked 2026-11-18
Official sheet lists Standard Fiberglass construction and charcoal/gray roll widths and lengths, including 36-inch-wide 100-foot rolls used by the fictional stock ledger.
Listed formats do not guarantee current local availability or price. Roll length/width does not prescribe cut allowances, mesh tension, compatible spline or installed performance.
Andersen — Half Insect Screen Installation/Removal Guide, 200 Series Tilt-Wash Double-Hung, 0005476 BA (01/26/07)
ST19 · Checked 2026-11-18
Model-specific original half-screen practice: bottom pull tab; upper/lower latches on one side opened while the opposite pair stays closed; passage through fully opened lower sash; closed-side latches behind the jamb leg form the pivot; rotate other edge in; close latches and slide screen to sill. Removal reverses the guide’s opening-and-latch sequence. Engaged half screen can still move vertically in its channel. Both pages visually checked.
Applies only to the identified Andersen 200 Series Tilt-Wash double-hung HALF screen covered by this guide; confirm applicability and current instructions for the actual product. This does not establish ADFORS Case S fit, dimensions, rescreen compatibility or replacement-part approval. Course practice excludes elevated access and any pressure/fall-protection test. Original course diagrams are schematic and not copied manufacturer art.
Work, Money & Place Original Case S
CASE-SC-01 · Checked 2026-11-18
Fictional window-screen-repair inventory, package prices, full-cycle times, costs, stock movements and receipt events created for this course.
Not a customer job, supplier quote, local price survey, productivity target, tax advice or earnings forecast.