Hold an affected task, preserve customer property and agree a supported scope and price response to unknown parts, fit defects or access changes.
Open the full-size diagram ↗
Example and worksheet
Read the separately labeled fictional Case S records, then complete your own dated assessment. The example is not a supplier quote, legal determination, physical demonstration or beginner production-time guarantee.
Recognize a changed condition before it becomes waste
A change is not limited to a customer asking for another screen. A reusable frame found bent, a different spline channel, damaged retaining hardware or a measurement that does not match the opening can change the accepted task. Compare the actual unit to the S07 assessment and the accepted S08 offer before cutting. Separate the observed fact from its cause: a rail is visibly distorted; that does not prove who damaged it or which replacement part will solve the problem.
Use S16 for the unit ID, original agreement, changed condition, supporting evidence, held action and proposed next step. Explain what can still proceed independently. An unknown component on one unit does not automatically invalidate every accepted screen, but it must not disappear under a statement that the six-screen job is complete. Keep the household informed without turning a technical uncertainty into pressure for an immediate upgrade. A clear pause is often less costly than consuming material on an assumption you cannot later justify.
Resolve compatibility and fit through the right evidence
If a part is unknown, obtain the correct identification and applicable instructions. Similar appearance, the customer’s recollection or a supplier’s broad category name may be insufficient to establish a matched system. Do not transfer a cut deduction or retention method from a different product simply because it worked yesterday. A new-frame trial fit is a verification point, not an opportunity to force the assembly or modify a window until it accepts the wrong size. Building or glazing repair remains outside this starter service.
Determine whether the problem is an operator error, an agreed condition change or an unresolved original assumption before discussing the charge. Those categories may lead to different contractual and customer-rights consequences. Preserve evidence, avoid blaming the customer and communicate a supported correction or a revised decision. If the required component cannot be obtained for the visit, use the agreed hold, return or referral process. A household’s willingness to accept an improvised repair does not establish technical suitability or remove your responsibilities.
Separate an estimate change from actual job performance
The original Case S accepted plan remains $360 net with its documented scope, stock and time. The alternative actual path models extra mesh and spline loss, greater fuel use and another owner hour; it does not rewrite that accepted price. Actual materials become $59.40, fuel $18 and owner time 4.5 hours. The matching management result is $102.40 before allowance and other applicable business taxes, a $37.26 decline from the $139.66 plan. Record the reason rather than editing the plan to make the comparison disappear.
The $3.26 extra material amount consists of documented job-attributable losses in the example. A lost piece is not the same as a purchase, and an intact reusable offcut is not automatically waste. Preserve the stock movements and evidence of disposition. A correction may be your cost even when no additional customer charge is appropriate. Conversely, newly requested eligible work may require an agreed price. The cost sheet records what happened; it does not itself decide what the customer legally owes or authorize a retroactive increase.
Control access, weather and additional-visit consequences
A site change can make a supported screen task impossible that day. If the workstation cannot be secured, the required route is obstructed or access would require excluded elevated work, stop the affected operation and discuss the options. Do not let a full route turn a condition into a safe one. Record a postponement, narrower accepted scope or referral where appropriate. If access fails, use the previously agreed process instead of inventing a new charge after arriving.
Another trip affects actual travel, capacity and cash timing. S12 should show when new purchases or fuel will be paid and when any customer receipt is actually expected to clear. A return to correct an error is not automatically a separately chargeable service call. A pickup-return exception needs item custody and an accepted work/return plan. Do not leave loose screens in an untracked pile or promise a fixed return time before identifying the part. Preserve a clear status for each opening and arrange an appropriate household handoff.
Close the decision with evidence and a new version where needed
Offer a clear supported choice: proceed with the unchanged accepted task, accept a specifically revised eligible task, hold while evidence or parts are obtained, or decline/referral. State the effect on units, work already done, charge, timing and customer property. Retain the original version and the accepted revision. If the revised proposal is sold at the home, review that transaction’s cancellation disclosures and lawful start time before its affected work or cutting. Do not carry an online-only interpretation from the original email order into an onsite addition. A message saying okay must refer to a clear proposal and does not waive mandatory rights (SB22–SB24).
After the visit, record the actual correction, checks and any unresolved work in S19 and S20. Feed the cause into the next assessment and quote process. A wrong opening tag suggests a traceability correction; repeated unavailable spline sizes suggest a stocking or intake problem; wasted material from unsupported tension suggests more practice. Do not normalize returns as inevitable without learning from them. The aim of change control is a fair, technically supported decision and accurate records, including when the safest and most honest decision is not to complete the affected task.
Put it into practice
Your assignment
Resolve a changed frame condition without rewriting history.
Inputs
- An accepted rescreen frame is bent and its replacement retention system is unidentified.
- The actual teaching path records $3.26 job losses, fuel $18 and 4.5 owner hours; original price remains $360 net.
- Another visit may be needed, but no new charge has been approved.
- The original order was formed entirely online. A replacement or other addition is now being proposed in person at the home.
Your deliverable
S16 decision record with S15 customer notice and S12 timing update.
Saved only in this browser when storage is available. Export this page separately and use fictional identifiers in practice.
Show the worked answer
- Hold the affected unit; identify supported options and discuss the scope/charge/timing consequence before changed work. Do not force fit or borrow another product’s rule.
- Preserve the accepted plan. Record actual material $59.40 and result $102.40, variance−$37.26, with losses separate from use/purchases.
- A further visit is not automatically billable; document custody and an agreed return plan if pickup-return is accepted.
- Check the new onsite proposal’s cancellation rules, notices and start time before any affected work. Keep the original no-deposit, no pre-work cancellation/rescheduling-charge policy separate from mandatory rights; do not invent a new fee or waiver.
Show the self-check criteria
- Observed fact, responsibility assessment and proposed remedy are separate.
- No retroactive price change is created by the cost sheet.
- Every affected unit and cash-timing consequence has an explicit status.
- An onsite addition receives its own rights and timing review; the original email acceptance is not treated as a universal exemption.